输变电项目竣工环保验收常见问题及对策研究  被引量:1

Common Problems and Countermeasures of Environmental Protection Acceptance after Completion of Power Transmission and Transformation Projects

在线阅读下载全文

作  者:肖增旭 Xiao Zengxu(Guangdong Nuclear Power Engineering Survey Institute,Guangzhou 510800,China)

机构地区:[1]广东核力工程勘察院,广东广州510800

出  处:《皮革制作与环保科技》2024年第17期196-198,共3页Leather Manufacture and Environmental Technology

摘  要:为了规范交流输变电过程项目建设,本文对交流输变电过程项目的特点及其竣工环保验收要求进行了概述,,详细阐述了交流输变电工程项目竣工环保验收工作中存在的问题,并提出对竣工环保验收工作的全过程优化。通过加强竣工环保验收调查、引领各部门协调配合、完善竣工环保验收制度等措施,切实降低项目建设对生态环境造成的负面影响。In order to standardize the construction of AC power transmission and transformation process projects,this article provides an overview of the characteristics of AC power transmission and transformation process projects and their requirements for completion environmental protection acceptance.It elaborates on the problems that exist in the completion environmental protection acceptance work of AC power transmission and transformation engineering projects,and proposes the optimization of the entire process of completion environmental protection acceptance work.By strengthening the investigation of completion environmental protection acceptance,leading the coordination and cooperation of various departments,and improving the completion environmental protection acceptance system,measures are taken to effectively reduce the negative impact of project construction on the ecological environment.

关 键 词:输变电项目 环保验收 常见问题 

分 类 号:TS5[轻工技术与工程—皮革化学与工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象