检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙仁龙 滕孔先 程佳豪 周磊[1] 孙明慧 SUN Renlong;TENG Kongxian;CHENG Jianhao;ZHOU Lei;SUN Minghui
机构地区:[1]中国石油天然气管道工程有限公司天津分公司,天津300450 [2]国家石油天然气管网集团有限公司工程技术创新公司,天津300450
出 处:《化工设计通讯》2024年第9期138-143,共6页Chemical Engineering Design Communications
摘 要:针对人工岛NP4-1D/NP4-2D至转油站NP403×1LP油气混输海底管道,利用OLGA工艺模拟软件,分别对管线进行稳态计算,针对停输再启动工况、稳态段塞工况、清管段塞工况及管线投产预热进行分析,得到了管线水力和热力数据、停输再启动安全时间、段塞量等数据和规律,可用于指导工艺设计和生产操作。For the underwater pipeline of oil and gas mixed transportation from artificial island NP4-1D/NP4-2D to oil transfer station NP403×1LP,steady-state calculations were conducted on the pipeline using OLGA process simulation software.Analysis was conducted on the shutdown and restart conditions,steady-state slug conditions,cleaning slug conditions,and pipeline preheating for production.Hydraulic and thermal data,safety time for shutdown and restart,and slug quantity of the pipeline were obtained The data and patterns can be used to guide process design and production operations.
关 键 词:油气混输 海底管道 稳态计算 停输再启动 段塞工况 清管工况 OLGA
分 类 号:TE832.3[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147