检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:任庆军 高涵 REN Qingjun;GAO Han(GOA Co.,Ltd.,Hangzhou 310012,China)
出 处:《建筑电气》2024年第S02期36-42,共7页Building Electricity
摘 要:以某超高层建筑群为例,探讨在项目不同建设阶段和交付周期中,消防给水系统的供水方式以及水泵连锁工作状态的转换方案。通过分析不同阶段的分期交付中,分段临时高压供水方式和常高压供水方式的电气消防联动、连锁控制的技术要点,针对性探讨该领域的技术落实和实际应用。A super high-rise building complex is taken as an example to discuss the conversion scheme of water supply mode and water pump interlocking working state of the fire water supply system in different construction stages and delivery cycles of the project.Through analysis on key technical points of electrical fire control linkage and interlocking control of temporary segmented high-pressure water supply and constant high-pressure water supply in different stages of phased delivery,the technical implementation and practical application in this field are discussed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.181.40