超高层办公消防水泵分期控制案例研究  

Case Study on Stage Control of Fire Pumps in Super High-rise Office Buildings

在线阅读下载全文

作  者:任庆军 高涵 REN Qingjun;GAO Han(GOA Co.,Ltd.,Hangzhou 310012,China)

机构地区:[1]大象建筑设计有限公司,杭州市310012

出  处:《建筑电气》2024年第S02期36-42,共7页Building Electricity

摘  要:以某超高层建筑群为例,探讨在项目不同建设阶段和交付周期中,消防给水系统的供水方式以及水泵连锁工作状态的转换方案。通过分析不同阶段的分期交付中,分段临时高压供水方式和常高压供水方式的电气消防联动、连锁控制的技术要点,针对性探讨该领域的技术落实和实际应用。A super high-rise building complex is taken as an example to discuss the conversion scheme of water supply mode and water pump interlocking working state of the fire water supply system in different construction stages and delivery cycles of the project.Through analysis on key technical points of electrical fire control linkage and interlocking control of temporary segmented high-pressure water supply and constant high-pressure water supply in different stages of phased delivery,the technical implementation and practical application in this field are discussed.

关 键 词:超高层建筑群 临时加压系统 过渡期临时加压系统 常高压系统 联动控制 连锁控制 

分 类 号:TU892[建筑科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象