检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁旭锋 YUAN Xufeng(Gansu Road&Bridge Construction Group Co.,Ltd.,Lanzhou 730000,Gansu,China)
机构地区:[1]甘肃路桥建设集团有限公司,甘肃兰州730000
出 处:《工程技术研究》2024年第15期22-24,共3页Engineering and Technological Research
摘 要:为减少跨河布置公路桥梁的阻水面积,部分公路桥梁结合防洪评价要求,设计整幅双柱式墩,来减少桥墩数量。为研究高速公路整幅双柱式墩架梁顺序对其结构受力的影响,文章以甘肃省庆阳地区某高速公路涉河桥梁工程为例,通过MIDAS软件按照原设计方案进行建模,分析了不同梁板安装顺序对下部结构受力及变形的影响,找出两种荷载工况下混凝土截面最大拉、压应力值,可为相关工程中的梁板安装施工提供参考。In order to reduce the water-blocking area of highway bridges across rivers,some highway bridges are designed with full-span double-column piers to reduce the number of piers according to the requirements of fl ood control evaluation.In order to study the influence of the full-span double-column pier beam erection sequence on the structural stress of the expressway,this paper takes the river-related bridge engineering on an expressway in Qingyang of Gansu Province as an example.The MIDAS software is used for model according to the original design scheme,and the influence of different beam plate installation sequences on the stress and deformation of the substructure is analyzed.Finding the maximum tensile and compressive stress values of the concrete section under two load conditions can provide reference for the installation construction of beam plate in related engineering.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7