检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘以汉 LIU Yihan(China Gezhouba Group Municipal Engineering Co.,Ltd.,Yichang 443000,Hubei,China)
机构地区:[1]中国葛洲坝集团市政工程有限公司,湖北宜昌443000
出 处:《工程技术研究》2024年第15期44-47,共4页Engineering and Technological Research
摘 要:城际铁路因建设于市区,各工点施工场地大多受限。区间隧道具有断面大、距离长、埋深大、工期紧迫、地质复杂等特点,针对大长区间,一般在区间分段设置工作井。文章通过研究φ9100 mm级别盾构机尺寸及施工作业的空间需求,分析了盾构工作井尺寸,旨在为类似工程的勘察设计工作提供参考。Because the construction of intercity railway is in urban areas,the construction sites are mostly restricted.The interval tunnel has the characteristics of large section,long distance,large buried depth,urgent construction period and complex geology.For the large and long interval,the working well is generally set up in the interval section.By studying the size ofφ9100 mm shield machine and the space requirements of construction operation,this paper analyzes the size of shield working well,so as to provide reference for the investigation and design of similar engineering.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200