检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱叶沁 ZHU Yeqin(State Nuclear Power Investment Corporation Ltd.,Shanghai 201106,China)
机构地区:[1]国核投资有限公司,上海201106
出 处:《工程技术研究》2024年第16期145-147,共3页Engineering and Technological Research
摘 要:风力发电的优势较为显著,其消耗的资源为可再生资源,因此经济效益可观,但我国许多风电场都建设在山地区域,工程施工难度大。文章通过分析山地风电项目施工的特征,进一步探究了山地风电风机基础土建施工的技术要点与质量管控要点。The advantages of wind power generation are obvious,and the resources it consumes are renewable resources,so the economic benefi ts are considerable.However,many wind farms in China are built in mountainous areas,and the engineering construction is difficult.By analyzing the characteristics of wind power project construction in mountainous areas,this paper further explores the technical points and quality control points of wind turbine foundation civil construction in mountainous areas.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3