作 者:苗锋 MIAO Feng(Hunan Zhongye Changtian Energy Conservation and Environmental Protection Technology Co.,Ltd.,Changsha 410205,Hunan,China)
机构地区:[1]湖南中冶长天节能环保技术有限公司,湖南长沙410205
出 处:《工程技术研究》2024年第16期205-207,共3页Engineering and Technological Research
摘 要:为了适应生产发展的需要,钢企选择通过“新建一期,预留二期”的方式建设双机组烧结余热发电主厂房。文章通过工程实例,对以往该类厂房结构的分期建设方案进行了总结。针对不足之处,提出不受二期招标设备影响的主厂房同步建设方案。有效降低了施工难度,减少了投资,解决了实际问题。In order to meet the needs of production development,many steel enterprises choose to build the main power house of double-unit sintering waste heat power generation through the way of"building phase I and reserving phase II".Through engineering examples,this paper summarizes the previous phased construction scheme of this kind of power house structure.In view of the shortcomings,the synchronous construction scheme of the main power house which is not affected by the bidding equipment of phase II is put forward.It effectively reduces the diffi culty of construction,reduces investment,and solves practical problems.
关 键 词:余热发电主厂房 厂房结构设计 同步建设 钢筋混凝土框排架结构