检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Elizaveta S.Gladchenko Anna E.Gubanova Denis M.Orlov Dmitry A.Koroteev
机构地区:[1]Skolkovo Institute of Science and Technology,Russian Federation [2]Digital Petroleum LLC,Russian Federation
出 处:《Petroleum》2024年第1期39-48,共10页油气(英文)
摘 要:The capacitance-resistance model(CRM)has been a useful physics-based tool for obtaining production forecasts for decades.However,the model's limitations make it difficult to work with real field cases,where a lot of various events happen.Such events often include new well commissioning(NWC).We introduce a workflow that combines CRM concepts and kriging into a single tool to handle these types of events during history matching.Moreover,it can be used for selecting a new well placement during infill drilling.To make the workflow even more versatile,an improved version of CRM was used.It takes into account wells shut-ins and performed workovers by additional adjustment of the model coefficients.By preliminary re-weighing and interpolating these coefficients using kriging,the coefficients for potential wells can be determined.The approach was validated using both synthetic and real datasets,from which the cases of putting new wells into operation were selected.The workflow allows a fast assessment of future well performance with a minimal set of reservoir data.This way,a lot of well placement scenarios can be considered,and the best ones could be chosen for more detailed studies.
关 键 词:Capacitance-resistance model(CRM) Field development optimization Infill drilling Interwell connectivity KRIGING New well commissioning(NWC)
分 类 号:TE24[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28