宜兴抽水蓄能电站综合厂用电率影响因素分析及控制措施研究  被引量:1

Analysis of Factors Affecting the Comprehensive Plant Electricity Consumption Rate of Yixing Pumped Storage Power Plant and Research on Control Measures

在线阅读下载全文

作  者:丁枭 徐伟 胡馨月 吉俊杰 姚航宇 DING Xiao;XU Wei;HU Xinyue;JI Junjie;YAO Hangyu(East China Yixing Pumped Storage Co.Ltd.,Yixing 214205,China;State Grid New Source Holdings Co.Ltd.,Maintenance Branch,Beijing 100068,Chnia)

机构地区:[1]华东宜兴抽水蓄能有限公司,江苏省宜兴市214205 [2]国网新源控股有限公司检修分公司,北京市100068

出  处:《水电与抽水蓄能》2024年第5期115-120,共6页Hydropower and Pumped Storage

摘  要:在电力市场化背景下,常规主体参与电力市场交易逐渐成熟,同时对调节性电源参与电力市场交易的规则和要求日趋明确。综合厂用电率是抽水蓄能电站一项重要经济性指标,鉴于此,阐述了抽水蓄能电站厂用电率的构成,分析了影响综合厂用电率的相关因素,同时提出了降低综合厂用电率的控制措施,旨在为抽水蓄能电站综合效率提升工作提供参考和借鉴。In the context of electricity marketization,the participation of conventional entities in electricity market transactions has gradually matured,while the rules and requirements for regulating power sources to participate in electricity market transactions have become increasingly clear.The comprehensive plant power consumption rate is an important economic indicator of pumped storage power plants.In view of this,this article elaborates on the composition of the plant power consumption rate of pumped storage power plants,analyzes the relevant factors that affect the comprehensive plant power consumption rate,and proposes control measures to reduce the comprehensive plant power consumption rate,aiming to provide reference and inspiration for improving the comprehensive efficiency of pumped storage power plants.

关 键 词:综合厂用电率 抽水蓄能 能效提升 机组负荷 

分 类 号:TM93[电气工程—电力电子与电力传动]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象