作 者:王怡平 WANG Yiping(Yunnan PetroChina Kunlun Gas Co.,Ltd.,Kunming 650200,China)
机构地区:[1]云南中石油昆仑燃气有限公司,云南昆明650200
出 处:《石油工程建设》2024年第5期67-70,共4页Petroleum Engineering Construction
摘 要:为了研究高压输电塔倒塌产生的冲击对临近埋地输气管道的影响,以交叉敷设的某110 kV高压输电塔与某输气管道为研究对象,采用LS-DYNA软件模拟计算管道受输电塔倒塌冲击产生的应力、位移、移动速度的变化规律。研究表明,加管沟保护后管道的最大等效应力减少约26.89%、最大总位移减少约48.60%、最大总压力减少约30.61%、最大总速度减少约44.57%,其保护效果显著。To study the impact of high-voltage transmission tower collapse on adjacent buried natural gas pipelines,a 110 kV high-voltage transmission tower and a gas transmission pipeline that are cross laid were studied.LS-DYNA software is applied to simulate and calculate the stress,displacement,and moving velocity of the pipeline caused by transmission tower collapse.The results show that with the protection of the pipe duct,the maximum equivalent stress,the maximum total displacement,the maximum total pressure,and the maximum velocity are reduced by 26.89%,48.6%,30.61%,and 44.57%respectively.The protective effect is very remarkable.
分 类 号:TE973[石油与天然气工程—石油机械设备] TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7