检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王蓓[1] 王彦 WANG Bei;WANG Yan(Shanxi Polytechnic College,Taiyuan,Shanxi,030006,China;Shanxi Provincial Geological Prospecting Bureau 211 Geological Team Co.,LTD,Xinzhou,Shanxi,034000,China)
机构地区:[1]山西职业技术学院,山西太原030006 [2]山西省地质勘查局二一一地质队有限公司,山西忻州034000
出 处:《建材技术与应用》2024年第5期64-69,共6页Research and Application of Building Materials
摘 要:为高效而精确地完成装配式混凝土结构的施工,以中建东湖锦城项目为载体对装配式混凝土PC构件的施工技术进行了分析,尤其是装配式混凝土PC构件起吊安装定位和标高等施工控制,同时进行了力学计算分析。工程实践表明,装配式混凝土PC构件的应用可提高施工效率和节约施工时间。In order to complete the construction of prefabricated concrete structure efficiently and accurately,the construction technology of prefabricated concrete PC components is analyzed in the East Lake Jincheng project of China Construction Corporation,especially the construction control of hoiting,installation,positioning and elevation of prefabricated concrete PC components,and the mechanical calculation and analysis are carried out.Engineering practice shows that the application of prefabricated concrete PC components can improve construction efficiency and save construction time.
分 类 号:TU741[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15