综采工作面过断层矿压显现规律的相似模拟研究  

Similar simulation of mine pressure behavior law with cross-fault of fully mechanized mining face

在线阅读下载全文

作  者:李亭亭 LI Tingting(Shanxi Zezhou Tiantaiyuenan Coal Mine Co.,Ltd.,Jincheng 048000,China)

机构地区:[1]山西泽州天泰岳南煤矿有限公司,山西晋城048000

出  处:《陕西煤炭》2024年第11期55-59,共5页Shaanxi Coal

摘  要:为研究综采工作面过断层时,断层对顶板破坏情况和矿压显现规律的影响,利用断裂力学理论构建计算模型研究基本顶在断层活化作用下的来压步距,铺设物理实验模型模拟工作面过不同断层时基本顶内裂扩展、贯通以及基本顶垮落、压架的过程,分析了顶板下沉量的变化特征。研究结果表明,工作面过断层时,断层对基本顶中的裂纹具有活化作用,使顶板来压步距变小,裂纹受到工作面前方的集中应力的作用不断扩展最后贯通至工作面,导致顶板发生切落破坏,对液压支架造成冲击作用使其发生压缩变形,工作面过落差不同的断层时,发现落差大的断层对工作面矿压显现的影响更大。In order to study the influence of faults on roof failure and pressure behavior law when the comprehensively mechanized mining face passes faults,a computational model is constructed using the theory of fracture mechanics to probe the weighting step distance of the basic roof under the action of fault activation,and the physical experimental model is built to simulate the process of basic roof’s internal fracture propagation and penetration,basic roof collapse and support compression when the working face passes through different faults,and the change characteristics of roof subsidence are analyzed.The research results show that when the working face passes through the fault,the fault has an activation effect on the crack on the basic roof,so that the weighting step distance of the roof becomes smaller,the crack is continuously expanded by the concentrated stress in front of the working face,and finally penetrates to the working face,resulting in the cutting failure of the roof,and causing the compressive deformation due to impact on the hydraulic support.When the working face passes through faults with different drops,it is found that the fault with large drop has a greater impact on the pressure behavior on the working face.

关 键 词:断层 顶板破断 来压步距 支护阻力 

分 类 号:TD322[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象