检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林杰 祝江林 黄思璐 肖强 黄玉冰 雷斯达 周攀 LIN Jie;ZHU Jianglin;HUANG Silu;XIAO Qiang;HUANG Yubing;LEI Sida;ZHOU Pan(Research and Development center for Highway Construction and Maintenance Technology,Wuhan 430000,China;Hubei Jiaotou Intelligent Testing Co.,LTD,Wuhan 430000,China)
机构地区:[1]公路建设与养护技术材料及装备交通运输行业研发中心,湖北武汉430000 [2]湖北交投智能检测股份有限公司,湖北武汉430000
出 处:《岩土工程学报》2024年第S02期177-182,共6页Chinese Journal of Geotechnical Engineering
基 金:交通运输部在役干线公路基础设施与安全应急数字化试点项目:湖北省在役干线公路基础设施智能养护试点(212);湖北省交通运输厅科技项目:基于大数据技术的湖北高速公路隧道养护智能决策研究(2022-11-4-5)。
摘 要:隧道衬砌结构在施工过程中容易出现空洞区域,严重影响了隧道运营的长期稳定性,为研究衬砌结构局部减薄对隧道变形及力学特性的影响,开展了1000组不同隧道埋深、减薄位置角度、减薄长度及减薄厚度条件下的数值模拟计算,通过统计分析不同工况条件下的数值模拟计算结果发现:衬砌减薄位置对最大变形位置影响较小,隧道最大压应力主要集中在隧道的左右拱脚位置,其中多数情况下隧道右边局部减薄容易造成隧道左拱脚位置压应力集中。衬砌局部减薄有可能造成左拱脚及右拱脚处拉应力集中,而更多条件下衬砌局部减薄有可能造成局部减薄区域附近拉应力集中,对于拉应力集中主要为左右拱脚处及减薄区域附近。基于1000组数值模拟计算结果,建立了CART隧道破损预测模型,并通过2个算例验证该模型的合理性及有效性,该研究数值模拟研究可为隧道局部减薄力学分析及隧道稳定性预测提供依据。The cavity area commonly appears in lining structures in engineering practice,which has great influences on the long-term stability of tunnel operation.In order to investigate the influences of thickness reduction of lining structures on displacement and mechanical characteristics of tunnels,1000 groups of numerical simulations with different buried depths,angles of local thickness reduction location,reduction lengths and thicknesses of linings of tunnel the conducted.Through analysis of the numerical simulation results,it can be concluded that the local thickness reduction area has less influences on displacement.Tthe maximum compressive stress of the tunnel is mainly concentrated at the left and right arch feet of the tunnel,and local thinning at the right side of the tunnel is prone to causing stress concentration at the left arch feet of the tunnel.Local thinning of linings may cause tensile stress concentration at the left and right arch feets,while under more conditions,local thinning of linings may cause tensile stress concentration near the local thinning area.The tensile stress concentration mainly occurs at the left and right arch feets and near the thinning area.Based on the 1000 groups of numerical simulation results,the CART tunnel damage predictive model is established.Meanwhile,2 numerical examples verify the validity of the predictive model.This study provide numerical simulation basis for the mechanical and stability analysis of tunnels under local thickness reduction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49