检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:任杰 REN Jie(Hekoucun Reservoir Operation Center,Henan Province,Jiyuan 454650,China)
机构地区:[1]河南省河口村水库运行中心,河南济源454650
出 处:《河南水利与南水北调》2024年第8期71-72,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:溢洪道是水库工程中十分重要的泄洪建筑物,在参与水资源的调度工作中直接影响人民的生命财产安全。但溢洪道在施工及后期运营期间,其工作闸会产生各种问题,文章结合河口村水库运营过程中工作闸产生的故障,提出采取的针对性处理措施,可为其他水库工作闸故障提供一定的参考依据。Spillway is a very important flood releasing structure in reservoir engineering,which would directly affect the safety of people's lives and property in reservoir regulation.However,during the construction and later operation of the spillway,various problems may arise with its service gate.This paper analyzes the faults that occurred during the operation of the service gate in Hekoucun Reservoir and proposes targeted treatment measures,which could be used for reference for treatment of service gate faults of other reservoirs.
分 类 号:TV698.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7