HDPE管接头方式的选择及施工控制要求  

Selection of HDPE Pipe Joint Method and Construction Control Requirements

在线阅读下载全文

作  者:瞿隆钰 QU Longyu(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041

出  处:《云南水力发电》2024年第S02期35-37,共3页Yunnan Water Power

摘  要:以斯里兰卡康提北供水项目为主要研究对象,该项目HDPE管总长度约为570 km,管径分别为63 mm、90 mm、110 mm、160 mm、225 mm、280 mm,施工工期为36个月,管道沿现有道路边缘敷设,开挖深度1 m,针对该项目的设计要求及施工特点,管道接头连接方式的选择及施工控制尤为重要。This paper focuses on the Kandy North Water Supply Project in Sri Lanka as the main research object.The total length of HDPE pipes in this project is about 570 km,with diameters of 63 mm,90 mm,110 mm,160 mm,225 mm,and 280 mm respectively.The construction period is 36 months,and the pipes are laid along the existing road edge with an excavation depth of 1m.Based on the design requirements and construction characteristics of this project,the selection of pipe joint connection methods and construction control are particularly important.

关 键 词:HDPE管 接头方式的选择 施工控制 施工特点 

分 类 号:TV674[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象