检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹富俊 CAO Fujun(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2024年第S02期41-44,共4页Yunnan Water Power
摘 要:深井开挖支护施工阶段及后续混凝土衬砌施工阶段均需要载人升降装置运输人员上下井,尤其在开挖爆破阶段,载人装置必须频繁进行人员输送及爆破避让。“双保险”载人提升系统技术采用2台同步卷扬机做牵引提升设备,具备自主防坠落装置的立井单绳罐笼做载人媒介,通过布置在深井井口的悬挑门架、钢丝绳实现人员垂直升降输送,以“双绳”系统互为备用的设计理念,为提升系统安全提供“双保险”。During the deep well excavation and support construction phase,as well as the subsequent concrete lining construction phase,a manned lifting device is required to transport personnel up and down the well.Especially during the excavation and blasting phase,the manned device must frequently transport personnel and avoid blasting.The"dual insurance"manned lifting system technology uses two synchronous winches as traction lifting equipment,and a single rope cage with an independent anti fall device as the manned medium.The vertical lifting and transportation of personnel is achieved through the cantilever gantry and steel wire rope arranged at the wellhead of the deep well,with the design concept of"dual rope"system as backup for each other,providing"dual insurance"for improving system safety.
分 类 号:TV554.9[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.74.140