检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孔玮琦 李凯协 蔡斌 许浩强 KONG Weiqi;LI Kaixie;CAI Bin;XU Haoqiang(Southern Power Grid Ultra High Voltage Transmission Company Guangzhou Bureau,Guangzhou 510700,China)
机构地区:[1]南方电网超高压输电公司广州局,广东广州510700
出 处:《电工技术》2024年第17期192-195,共4页Electric Engineering
摘 要:梳理牛从高压直流输电系统双回直流协调控制中无功控制优先等级及其逻辑,结合仿真和现场工程实际情况证明交流母线电压投切无功补偿设备优先于绝对最小滤波器容量限制的原因。同时,对比牛从高压直流输电系统直流与新东特高压直流输电系统直流绝对最小滤波器容量限制直流功率策略,并提出优化建议。This paper summarizes the priority level and logic of reactive power control in the dual circuit DC coordinated control of Niucong high-voltage DC transmission system,and proves the reason why the AC bus voltage switching reactive power compensation equipment takes priority over the absolute minimum filter capacity limit through simulation and on-site engineering practice.At the same time,compare the DC absolute minimum filter capacity limiting DC power strategy between Niucong high-voltage DC transmission system and Xindong ultra-high voltage DC transmission system,and propose optimization suggestions.
关 键 词:无功控制 交流母线电压 绝对最小滤波器限制 逆变站
分 类 号:TM721[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.9.180