高桩码头承插式T形桩帽安装灌浆工艺  

Installation of socketed T-pile cap and grouting process for high pile wharf

在线阅读下载全文

作  者:林红星[1,2] 何聪 冯先导 施少治 林明臻 LIN Hongxing;HE Cong;FENG Xiandao;SHI Shaozhi;LIN Mingzhen(CCCC Second Harbor Engineering Co.,Ltd.,Key Laboratory of Large-span Bridge Construction Technology of Ministry of Communications,Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure,Wuhan 430040,China;CCCC Highway Bridge National Engineering Research Center Co.,Ltd.,Beijing 100120,China;Fujian Transportation Construction Quality and Safety Centre,Fuzhou 350001,China)

机构地区:[1]中交第二航务工程局有限公司,长大桥梁建设施工技术交通行业重点实验室,交通运输行业交通基础设施智能制造技术研发中心,湖北武汉430040 [2]中交公路长大桥建设国家工程研究中心有限公司,北京100120 [3]福建省交通建设质量安全中心,福建福州350001

出  处:《水运工程》2024年第10期225-230,共6页Port & Waterway Engineering

基  金:山东省重点研发计划项目(2021ZLGX04);国家重点研发计划项目(2022YFB2603000);福建省交通运输科技项目(202254)。

摘  要:在传统高桩码头结构中,桩芯、桩帽常采用现浇工艺。受潮位变动区影响,现浇过程中钢筋、混凝土受海水浸泡侵蚀,难以控制结构质量。并且海上作业需要赶潮施工,人员风险性高。依托福建宁德18~20号泊位工程,介绍一种高桩码头承插式T形桩帽施工工艺。通过将T形桩帽承插式安装至钢管桩内,并利用UHPC材料灌浆与钢管桩形成整体。T形桩帽为一种新型结构,通过研究其安装、灌浆工艺,解决了高桩码头直桩装配化技术问题。应用结果表明,该工艺可以提高码头的装配化率和施工质量,应用效果良好。In traditional high pile wharf structures,the pile core and pile cap often adopt cast-in-place process.Due to the influence of tidal fluctuation zone,the reinforcement and concrete in the cast-in-place process are subject to seawater soaking and erosion,which makes it difficult to control the quality of the structure.Moreover,the marine operation needs to catch up with the tide construction,and the risk of personnel is high.Relying on the berth 18-20 project in Ningde,Fujian,this paper introduces a T-pile cap construction process using high pile wharf socket.By installing the T-shaped pile cap socket into the steel pipe pile and using UHPC material grouting to form a whole with the steel pipe pile.The T-pile cap is a new type of structure,and the installation and grouting process solves the technical problem of assembling straight piles for high pile wharf.The application results show that the process can improve the assembly rate and construction quality of the wharf,and the application effect is good.

关 键 词:T形桩帽 承插式安装 灌浆连接 装配化 

分 类 号:U656.113[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象