检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:雷波 Lei Bo(Yunnan Power Grid Co.,Ltd.,Dehong Power Supply Bureau,Dehong 678400,Yunnan,China)
机构地区:[1]云南电网有限责任公司德宏供电局,云南德宏678400
出 处:《云南电力技术》2024年第5期71-73,共3页Yunnan Electric Power
摘 要:为从根本上提升供电水平,需高质高效使用绝缘杆作业手段,加强复杂作业项目管控力度。基于此,本文以带负荷更换柱上开关实施流程为切入点,提出带电作业存在问题,阐述绝缘杆作业方法在复杂作业项目中的应用流程以及复杂项目推广建议,以供参考。In order to fundamentally improve the power supply level,it is necessary to use insulating rod operation means with high quality and high efficiency,and strengthen the management and control of complex operation projects.Based on this,this paper takes the implementation process of changing the switch on the column with load as the breakthrough point,puts forward the problems existing in live working,and expounds the application process of insulating rod working method in complex working projects and the promotion suggestions for complex projects for reference.
分 类 号:TM74[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.75.74