检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:方波 汤林 葛子红 Fang Bo;Tang Lin;Ge Zihong
出 处:《自然科学博物馆研究》2024年第5期43-49,共7页Journal of Natural Science Museum Research
摘 要:当前,我国科技馆建设呈暴发式增长,如何高效推进科技馆建设、让科技馆建设流程有章可循是科技馆建设者亟待解决的问题。本文简要分析当前国内科技馆建设流程以及科技馆建设过程中遇到的难点问题,以安徽省科技馆新馆展陈建设为例,探索科技馆建设各阶段应解决的任务目标及各阶段设计应达到的深度要求,并讨论了建设过程中应特别注意的事项,以期和国内科技馆同行共同探讨科技馆建设之路。At present,the construction of science and technology museums in our country is experiencing the explosive growth,how to promote the construction of science and technology museum efficiently,make the construction process of science and technology museum rules-based is an urgent problem that the construction of science and technology museum.This paper briefly analyzes the current construction process of domestic science and technology museums and the difficulties encountered in the construction process.Taking the construction experience of the Anhui Science and Technology Museum as an example,it explores the tasks and objectives that should be solved in each stage of science and technology museum construction and the depth requirements that should be achieved in each stage of design,and emphasizes the matters that should be paid special attention in the construction process.In order to discuss the road of science and technology museum construction with domestic science and technology museum construction counterparts.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117