检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Ping-wei Jiang Zhi-hong Zhang Hong Zheng Jin-kun Huang
机构地区:[1]Key Laboratory of Urban Security and Disaster Engineering of China Ministry of Education,Beijing University of Technology,Beijing 100124,China [2]China MCC17 Group Co.LTD,Maanshan,Anhui 243000,China [3]School of Naval Architecture,Ocean and Civil Engineering,Shanghai Jiao Tong University,Shanghai 200240,China
出 处:《Underground Space》2024年第2期312-330,共19页地下空间(英文)
基 金:financial support from the Key Program of National Natural Science Foundation of China(Grant No.52130905).
摘 要:In the new tunnel under close distance through the existing tunnel risk source,the grouting scheme developed to compensate for stratum losses is still based on empirical methods,relying on the overburden thickness of existing tunnels.This can potentially lead to an excessively high or low probability of uplift of existing tunnels.Proposing a coupled deformation analysis method between the grouting construction and adjacent existing tunnels is of great theoretical significance for developing grouting schemes.In order to reasonably limit the design parameters of grouting construction,based on the theory of fluid–solid coupling elastic pore-column expansion and the theory of random media,the calculation method of stratum displacement which simultaneously considers the coexistence of grout compaction expansion and permeability diffusion mode is derived,and the accuracy of the calculation method is verified by engineering examples.The accuracy of this calculation method was verified through engineering examples.Combined with the deformation coordination condition,the existing tunnel is regarded as an elastic Euler-Bernoulli continuous beam,and the finite element coupling balance equation of the interaction between the existing tunnel and the surrounding soil is obtained.Based on this,a coupling calculation model of the grouting construction and the deformation response of the adjacent existing tunnel is established.Combined with three times of grouting construction examples in the shield tunneling project of Beijing Metro Line 12 under the existing airport line,the reliability of the coupling calculation model to determine the grouting construction parameters is verified.The calculation parameters in the coupling calculation model have clear physical meanings,which can provide a theoretical basis for the grouting design of similar risk source projects.
关 键 词:GROUTING Close-range underpass TUNNEL Random medium theory Euler-Bernoulli continuous beam
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30