检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Yeyan Xu Liangzhong Yao Tianjiao Pu Siyang Liao Fan Cheng Ye Li Xinying Wang
机构地区:[1]School of Electrical Engineering and Automation,Wuhan University,Wuhan 430072,China [2]China Electric Power Research Institute,Beijing 100085,China. [3]China Electric Power Research Institute,Beijing 100192,China.
出 处:《CSEE Journal of Power and Energy Systems》2024年第5期1935-1954,共20页中国电机工程学会电力与能源系统学报(英文)
基 金:supported by the National Key R&D Program of China(2020YFB0905900);Science and Technology Project of SGCC(State Grid Corporation of China):The key Technologies for Electric Internet of Things(SGTJDK00DWJS2100042).
摘 要:Increasing distributed generators(DGs)and flexible loads(FLs)enable distribution systems to provide both active and reactive power reserves(P-Q reserves)in supporting the frequency and voltage regulations of transmission systems.However,such requirements at the interface between the transmission system operator(TSO)and distribution system operator(DSO)affect the distribution system operation security,considering the uncertainties of DGs and FLs.To exploit the reserve potential of distribution systems,this paper investigates the voltagedependent P-Q reserve capacity(V-PQRC)of such types of distribution systems.V-PQRC reflects the feasible space of PQ reserves that the DSO can provide to the TSO taking the voltage deviation limit at TSO-DSO interface into consideration,while ensuring the distribution system operation security under uncertainties of DGs and FLs.An evaluation method for VPQRC at the TSO-DSO interface is proposed.To improve the robust performance of the evaluation method,the DG uncertainty is captured by a generalized ambiguity set and the FL uncertainty is addressed by designing a constrained sliding mode controller(CSMC).Three objectives are considered in the evaluation,i.e.,P reserve capacity,Q reserve capacity,and the voltage deviation limit at the TSO-DSO interface.Then,a multiobjective optimization model integrating the generalized robust chance-constrained optimization and CSMC(GRCC-CSMC)is established for V-PQRC evaluation to obtain the Pareto optimal reserve schemes.Finally,a non-approximated selecting(NAS)method is proposed to build up a simplified V-PQRC linear model,which can be convenient to apply in the transmissiondistribution system coordination.Simulation results reveal that the V-PQRC evaluation method can achieve a good performance of accuracy and robustness against uncertainties.
关 键 词:Generalized robust chance-constrained optimization reserve capacity evaluation sliding mode control transmission-distribution system coordination voltage-dependent P-Q reserve capacity
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.110.116