检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Chen Xu Sheng Wang Caichu Xia Lei Liu Zhifu Ma Jun Yang
机构地区:[1]Institute of Rock Mechanics,Ningbo University,Ningbo,315211,China [2]Ningbo Key Laboratory of Energy Geostructure,Ningbo,315211,China [3]Shenzhen Shenshui Water Resources Consulting Co.,Ltd,Shenzhen,518000,China [4]POWERCHINA Chengdu Engineering Co.,Ltd,Urban and Rural Development Engineering Branch,Chengdu,610031,China
出 处:《Rock Mechanics Bulletin》2024年第4期70-82,共13页岩石力学通报(英文)
基 金:supported by the National Natural Science Foundation of China(Grant No.42207176 and 52278402);Ningbo Public Welfare Research Program Project(Grant No.2023S100);Ningbo Natural Science Foundation(Grant No.2022J116);China's National Key R&D Program“Intergovernmental International Science and Technology Innovation Cooperation”(Grant No.2024YFE0105800).
摘 要:A simplified two-stage method was employed to provide an explicit solution for the time-dependent tunnel-rock interaction,considering the generalized Zhang-Zhu strength criterion.Additionally,a simplified mechanical model of the yielding support structure was established.The tunnel excavation is simplified to a two-stage process:the first stage is affected by the longitudinal effect,while the second stage is affected by rheological behavior.Two cases are considered:one is that the rigid support is constructed during the first stage,and the other is that constructed at the second stage.Distinguished by the support timing at the seconde stage,different kinds of the“yield-resist combination”support method are divided into three categories:“yield before resist”support,“yield-resist”support,and“control-yield-resist”support.Results show that the support reaction of“control-yield-resist”is much higher than that of“yield before resist”if the initial geostress is not very high,but the effect is not obvious on controlling the surrounding rock deformation.So,the“yield before resist”support is much more economical and practical when the ground stress is not very high.However,under high geostress condition,through applying relatively high support reaction actively to surrounding rock at the first stage,the“control-yield-resist”support is superior in controlling the deformation rate of surrounding rock.Therefore,in the high geostress environment,it is recommended to construct prestressed yielding anchor immediately after excavation,and then construct rigid support after the surrounding rock deformation reaches the predetermined deformation.
关 键 词:Tunnel excavation STRAIN-SOFTENING Generalized Zhang-Zhu strength criterion Time-dependent behavior Longitudinal effect
分 类 号:U455.7[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49