综放面过穿层老巷的研究与实践  

Research and Practice of Fully Mechanized Caving Face Passing Through Layer Old Roadway

在线阅读下载全文

作  者:刘同军 LIU Tong-jun(Chaili Coal Mine,Zaozhuang Mining Group,Tengzhou 277519,China)

机构地区:[1]山东能源枣庄矿业集团柴里煤矿,滕州277519

出  处:《价值工程》2024年第30期62-64,共3页Value Engineering

摘  要:综放工作面在过穿层老巷期间,如果没有有效的顶板管理措施,容易造成老巷冒顶,从而导致工作面无法正常回采。该文主要对综放工作面过穿层巷道的技术、方法进行了研究,解决了穿层巷道区域煤层开采期间的顶板管理问题,对相似工作面的开采具有借鉴意义。If there are no effective roof management measures during the period of passing through the old roadway in the fully mechanized mining face,it is easy to cause the roof of the old roadway to collapse,resulting in the inability of the working face to recover normally.This paper mainly studies the technology and method of the roadway in the fully mechanized top coal caving face,which solves the problem of roof management during the coal seam mining in the area of roadway,and has reference significance for the mining of similar working faces.

关 键 词:穿层老巷 冒顶 区域煤层 开采 

分 类 号:TD8[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象