检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李洪波 LI Hongbo(Shanxi 3rd Geological Engineering Survey Institute,Jinzhong 030600,China)
机构地区:[1]山西省第三地质工程勘察院,山西晋中030600
出 处:《中国高新科技》2024年第17期140-142,共3页
摘 要:工程建设中,防空洞、落水洞、溶洞等空洞的存在会对建筑物及构筑物地基等地下工程产生不利影响。文章运用有限元差分法的正演和最小二乘法反演软件,对单层不同深度的空洞进行模拟,得出空洞的正反演模型。通过山西某地的高密度电法探测防空洞工程实例的反演试验,验证了高密度电法在不同深度数值模拟的规律性。In engineering construction,the existence of air-raid shelters,sinkholes,karst caves and other voids will have adverse effects on underground engineering such as the foundation of buildings and structures.In this paper,the forward and inverse models of single layer voids with different depths are obtained by using the forward modeling and least square inversion software of finite element difference method.Through the inversion test of a high density electrical method detecting air-raid shelter project in Shanxi Province,the regularity of numerical simulation of high density electrical method in different depths is verified.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7