检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王冕 胡震广 曹洪也 汪振双[2] WANG Mian;HU Zhenguang;CAO Hongye;WANG Zhenshuang(Physical Education Department,Dongbei University of Finance and Economics,Dalian 116025,China;School of Investment and Construction Management,Dongbei University of Finance and Economics,Dalian 116025,China)
机构地区:[1]东北财经大学体育教学部,辽宁大连116025 [2]东北财经大学投资工程管理学院,辽宁大连116025
出 处:《工程管理学报》2024年第5期94-99,共6页Journal of Engineering Management
基 金:教育部人文社会科学研究规划项目(24YJAZH148);东北财经大学研究生教学改革研究项目(yjyb202405);东北财经大学大学生创新创业项目(2024-05-28)。
摘 要:公共体育场馆PPP项目在建设和运营过程中,面临诸多不确定性风险因素,厘清其风险关系机理,进行风险控制和监管,对公共体育场馆PPP项目建设和运营至关重要。通过文献分析和专家访谈,从政治环境、法律政策、经济因素、施工方法等10个维度构建公共体育场馆PPP项目建设与运营阶段风险评价体系,并采用DEMATEL-ISM方法构建公共体育场馆PPP项目风险因素递接模型,分析其在建设和运营过程阶段各风险因素间的相互关系和作用路径。以期为公共体育场馆PPP项目建设和运营过程中风险预警和控制提供实证参考,为企业投资决策提供依据。The public sports venues PPP projects face many uncertain factors in the process of the construction and operation.Clarifying their risk relationships and implementing effective risk control and supervision are crucial for the public sports venues PPPprojects.In the research,a risk assessment system for the public sports venue PPP projects was established from 10 aspects,includingpolitical environment,legal policies,economic factors,and construction methods,through literature analysis and expert interviews.The DEMATEL-ISM method was used to construct a risk factor transfer model for public sports venue PPP projects,analyzing theinterrelationships and pathways of various risk factors in the public sports venue PPP projects.The research results provide empiricalreference for risk warning and control during the construction and operation of PPP projects in public sports venues,and provide abasis for enterprises to make reasonable investment decisions.
关 键 词:公共体育场馆 PPP项目 DEMATEL-ISM 风险关系
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30