The GSM-R Implementation Plan of Jakarta-Bandung High-speed Railway  

在线阅读下载全文

作  者:WEN Shiya PENG Liangyong ZHOU Yanfang(Translated) 

机构地区:[1]Electrification&Telegraphy Engineering Design Research Department,China Railway Design Corporation [2]不详

出  处:《Chinese Railways》2024年第1期46-51,共6页中国铁路(英文版)

摘  要:GSM-R system mainly provides dispatching communication servicessuch as train operation dispatching, realizes wired and wireless dispatchingcommunication, and provides safe and reliable train-ground informationtransmission services for high-speed train operation control system. Jakarta-Bandung HSR is the first “going global” HSR with whole industry chain built by China. It isconstructed based on CTCS-3 train control system standard. In order to ensure the safetransmission of train control system information under high-speed operation environment, aset of GSM-R system implementation scheme suitable for Jakarta-Bandung HSR is establishedin combination with the actual situation of Jakarta-Bandung HSR, referring to China's GSMRsystem technical standards and according to its actual business requirements. It includesGSM-R core network, wireless subsystem and data number, which can provide reference forthe construction of wireless communication system for China's HSR “going global”.

关 键 词:Jakarta-Bandung HSR GSM-R core network train control 

分 类 号:U238[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象