注浆加固断层带在宁武榆树坡公司的应用  

Application of grouting reinforcement fault zone in Ningwu Yushupo Company

在线阅读下载全文

作  者:李明 Li Ming(Shanxi Ningwu Yushupo Coal Industry Co.,Ltd.,Ningwu 036000,China)

机构地区:[1]山西宁武榆树坡煤业有限公司,山西宁武036000

出  处:《煤炭与化工》2024年第10期80-85,共6页Coal and Chemical Industry

摘  要:地质构造是制约煤炭资源开采和巷道安全掘进的不利因素,巷道掘进过地质构造时受围岩破碎、节理及裂隙发育等因素影响,巷道顶板支护困难、超高现象频繁且顶板出现淋水及煤壁破碎,给生产带来安全隐患。为了确保巷道安全、高产、高效掘进,对榆树坡矿5号煤准备大巷进行超前预注浆加固。现场应用效果显著,确保了围岩结构稳定,实现了过断层带安全生产,解决了过地质构造对掘进的影响,减少无效进尺,实现了高产、高效的目标。Geological structure was an unfavorable factor restricting the mining of coal resources and the safe excavation of roadways.When the roadway was excavated through the geological structure,it was affected by factors such as broken surrounding rock,joint and fracture development.The roof support of the roadway was difficult,the super-high phenomenon was frequent,and the watering and coal wall crushing appeard,which brought potential safety hazards to production.In order to ensure the safe,high-yield and high-efficiency excavation of the roadway,the advanced pre-grouting reinforcement was carried out in No.5 coal preparation roadway of Yushupo Mine.The field application effect was remarkable,which ensured the stability of the surrounding rock structure,realized the safe production through the fault zone,solved the influence of passing through geological structure on the tunneling,reduced the invalid footage,and achieved the goal of high yield and high efficiency.

关 键 词:超前预注浆 三维地震 井下定向钻探 地质构造 

分 类 号:TD74[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象