检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐定华 Tang Ding-hua(Sichuan Hongye Power Group Co.,Ltd.,Chengdu 610000,Sichuan Province,China)
机构地区:[1]四川宏业电力集团有限公司,四川成都610000
出 处:《建筑与装饰》2024年第20期76-78,共3页Construction & Decoration
摘 要:在电力系统建设中,送变电线路工程至关重要,其施工管理质量直接关系到整个项目的成功与否。本文针对一项总长946km的输电工程进行探究,详细论述了基础施工、塔杆建设和架线工作等关键环节的管理重点,并提出相应的管理措施。特别强调了在特殊气候和复杂地形条件下,如何通过科学的施工方案和严格的质量控制,确保施工进度和安全的问题。In the construction of electric power system,the power transmission and transformation line project is very important,and the quality of construction management is directly related to the success of the whole project.This paper explores a power transmission project with a total length of 946km,discusses the key management points of key links such as foundation construction,tower construction and wiring work in detail,and proposes corresponding management measures.Special emphasis is placed on how to ensure the construction progress and safety through scientific construction plans and strict quality control under special climate and complex terrain conditions.
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145