检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:史君林 冯少波[3] 明传中[3] 练章华[2] 万智勇 张强[2] SHI Junlin;FENG Shaobo;MING Chuanzhong;LIAN Zhanghua;WAN Zhiyong;ZHANG Qiang(School of Mechanical Engineering,Sichuan University of Science&Engineering,Yibin Sichuan 644000,China;National Key Laboratory of Oil&Gas Reservoir Geology and Exploitation,Southwest Petroleum University,Chengdu Sichuan 610500,China;PetroChina Tarim Oilfield Company,Korla Xinjiang 841000,China)
机构地区:[1]四川轻化工大学机械工程学院,四川宜宾644000 [2]西南石油大学油气藏地质及开发工程全国重点实验室,四川成都610500 [3]中国石油塔里木油田公司,新疆库尔勒841000
出 处:《中国安全生产科学技术》2024年第10期36-45,共10页Journal of Safety Science and Technology
基 金:国家自然科学基金项目(52204015);四川省自然科学基金项目(2023NSFSC0920);四川轻化工大学科研创新团队计划项目(SUSE652A004)。
摘 要:为应对钻探深度增加带来的井口设备超重载荷挑战,解决超重载荷承载台阶设计校核缺乏统一标准等问题,开展对承载台阶强度的研究。首先,建立考虑摩擦力的斜面台阶力学模型,提出承载台阶剪切失效模型下的计算公式,并对不同设计准则、安全系数和标准下的结果进行对比分析。然后,以万米超深井超重尾管设计的新型带45°斜坡的送入钻杆为例,结合理论分析与弹塑性非线性有限元,进行多种方法求解极限载荷研究,得到轴向的许用载荷和极限载荷,并对钻杆台阶面进行局部应变等评价。研究结果表明:所提出剪切失效公式可用于斜面台阶承载极限载荷计算,建议采用ASME BPVCⅧ-3规定的弹塑性方法进行精细分析,载荷系数取1.8计算许用极限载荷。研究结果为油气井行业中井口设备承载的斜台阶设计与计算提供理论基础与参考。To address the challenges of super-heavy loads on wellhead equipment due to increased drilling depths and the lack of unified standards for the design and verification of bearing steps under super-heavy loads,the strength of bearing steps was studied.A mechanical model of inclined step considering friction was established,then the calculation formula under the shear failure model of bearing step was proposed,and different design criteria,safety factors and standards were compared and analyzed.Taking the newly landing string with 45°inclined slope designed for super-heavy tail pipes in ultra-deep well of ten thousand meters as an example,combined with the theoretical analysis and elastoplastic nonlinear finite element,multiple methods were used to solve the ultimate load.The axial allowable load and ultimate load were obtained,and the local strain of the drill pipe step surface was evaluated comprehensively.The results show that the shear failure formula proposed in this paper can be used to calculate the ultimate load of inclined slope step.It is recommended to use the elastoplastic method specified in ASMEⅧ-3 for fine analysis,and the load coefficient should be taken as 1.8 to calculate the allowable ultimate load.The research results can provide theoretical basis and reference for the design and calculation of inclined steps bearing by wellhead equipment in oil and gas well industry.
关 键 词:超深万米井 承载斜台阶 送入钻杆 弹塑性分析 极限载荷
分 类 号:X937[环境科学与工程—安全科学] TE931[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28