检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段志刚 吴亚伟 Duan Zhigang;Wu Yawei(China Water Resources and Hydropower Eleventh Engineering Bureau Co.,LTD.,Zhengzhou 450000,China)
机构地区:[1]中国水利水电第十一工程局有限公司,郑州450000
出 处:《黑龙江科学》2024年第20期66-69,共4页Heilongjiang Science
摘 要:为探究水库除险加固工程大坝帷幕灌浆施工工艺,助力提高水库除险加固工程质量,以某水库为例,分析水库大坝渗流,采取设计灌浆帷幕工艺灌浆材料、灌浆机具、帷幕参数等工艺参数,优化帷幕灌浆施工工艺。帷幕灌浆补强后对灌浆区开展检查孔压水试验,跟踪坝后渗透量。结果表明,渗透率均在5 Lu以下,符合防渗标准,可推广应用。In order to explore the construction technology of dam curtain grouting,and help to improve the quality of dam reinforcement,the study takes a reservoir as an example;analyzes the seepage flow of reservoir dam;designs the process parameters,such as grouting materials,grouting machinery and curtain parameters;and optimizes the construction technology of curtain grouting.After curtain grouting reinforcement,the study conducts the test of checking pore pressure water in the grouting area to track the permeability behind the dam.The results show that the permeability is below 5 Lu,which meets the anti-seepage standard.It can be popularized and applied.
分 类 号:TV697.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7