大跨度分离式隧道电缆沟水沟标准化施工技术  

Standardized Construction Technology for Cable Trenches and Water Ditches in Large-span Separated Tunnel

在线阅读下载全文

作  者:田海涛 TIAN Haitao(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041

出  处:《云南水力发电》2024年第10期107-110,共4页Yunnan Water Power

摘  要:在高速公路隧道施工中,常规的水沟电缆槽施工,多采用小模板拼装后分次浇筑,由于模板数量多,连接接缝较多,从而带来一些施工缺陷,使成型后的混凝土整体性不好、表面平整度差和线形不顺等。通过对模板结构进行分析讨论,提出了一种整体式移动模架体系,解决了施工工序繁多、模板支撑材料数量多的问题,控制与改善小空间内交叉施工安全的影响,可加快施工进度,有效控制成本,保证施工质量,减少作业时间。In the construction of highway tunnels,the conventional construction of water ditches and cable troughs often uses small templates assembled and poured in stages.Due to the large number of templates and connecting joints,some construction defects may occur,resulting in poor overall integrity,poor surface flatness,and uneven linearity of the formed concrete.By analyzing and discussing the template structure,this article proposes a holistic mobile mold frame system.It solves the problems of multiple construction processes and a large amount of formwork support materials,controls and improves the impact of cross construction safety in small spaces,accelerates construction progress,effectively controls costs,ensures construction quality,and reduces operation time.

关 键 词:电缆沟水沟 移动模架 大跨度 功效 经济 

分 类 号:U455.4[建筑科学—桥梁与隧道工程] U415[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象