检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王希奋 Wang Xifen(Ili Xintian Coal Chemical Co.,Ltd.,Yining 835000)
机构地区:[1]伊犁新天煤化工有限责任公司,新疆伊宁835000
出 处:《大氮肥》2024年第5期294-297,301,共5页Large Scale Nitrogenous Fertilizer Industry
摘 要:煤制天然气项目配套煤气水分离装置在运行中出现煤气水贮槽排污管线排料困难、余热回收器堵塞、外送重芳烃水含量高等问题。针对存在问题经过多次研究分析,通过采取煤气水贮槽技术改造、余热回收器前增加煤气水尘分离器、新增2台重芳烃分液罐等有效措施,保证了煤气水分离装置安全、稳定、长周期运行。During the operation of the supporting gas-water separation device of the coal-to-natural gas project,there are problems such as the difficulty of discharging the sewage pipeline of the gas-water storage tank,the blockage of the pipe bundle of the waste heat recovery device,and the high content of heavy aromatic hydrocarbon water in the delivery.In view of the problems that arose,we carefully studied and analyzed them,formulated and implemented effective measures,e.g.improving gas-water storage tank,adding gas-water separation device before waste heat recovery,and adding two(2)sets of heavy aromatics knockout tank.It ensures the safe,stable and longterm operation of the gas-water separation device.
关 键 词:碎煤加压气化 煤气水分离 余热回收器 重芳烃 蒸馏装置
分 类 号:TQ545[化学工程—煤化学工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.149.239.180