检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡教民 Cai Jiaomin(Henan Energy and Chemical Group Zhongyuan Grand Chemical Co.,Puyang 457000)
机构地区:[1]河南能源化工集团中原大化公司,河南濮阳457000
出 处:《大氮肥》2024年第5期302-304,共3页Large Scale Nitrogenous Fertilizer Industry
摘 要:尿素汽提塔为尿素装置核心高压设备,汽提塔的长周期高效运行,直接影响到尿素装置的长周期、节能运行。介绍了汽提塔长周期运行中易出现的问题,汽提塔升级更换时,通过对汽提塔封头密封形式、液体进入和分布、分布管的密封形式、新型液位计应用等多项升级改进,提升汽提塔的长周期、节能运行,从而实现了尿素装置的节能降耗。Urea stripping tower is the critical high pressure equipment in urea plant.Its long term and high efficient operation will directly influence the long term operation and energy saving of the urea plant.This paper described some problems easily occurred during tripping tower operation.Several improvement measures were taken during updating and changing the stripping tower,such as gland sealing mode,liquid import and distribution,seal mode of distribution pipe,and the application of new level meter,to increase the operation term and energy saving,and therefore achieving the energy saving and consumption reduction of the urea plant.
分 类 号:TQ440.51[化学工程—化学肥料工业]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.184.109