检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Xiaolei LV Liangxing SHI Yingdong HE Zhen HE Dennis K.J.LIN
机构地区:[1]CollegeofManagementandEconomics,TianjinUniversity,Tianjin 300072,China [2]Laboratory of Computation and Analytics of Complex Management Systems(CACMS),Tianjin University,Tianjin 300072,China [3]Department of Statistics,Purdue University,West Lafayette,IN 47907,USA
出 处:《Frontiers of Engineering Management》2024年第3期413-429,共17页工程管理前沿(英文版)
基 金:supported by National Natural Science Foundation of China(Grant Nos.72101177,72231005,72261147706,and 72371183);State Administration of Science,Technology and Industry for National Defense,China(Grant Nos.JSZL2021204B001,and JSZL2022204B005);Tianjin Natural Science Foundation(Grant No.22JCQNJC01190).
摘 要:The joint optimization of production,maintenance,and quality control has shown effectiveness in reducing long-term operational costs in production systems.However,existing studies often assume that changes in the mean value of product quality characteristics in a deteriorating system follow a specific distribution while keeping variance constant.To address this limitation,we propose an innovative method based on the continuous ranking probability score(CRPS).This method enables the simultaneous detection of changes in mean and variance in nonconformities,thus removing the assumption of a specific distribution for quality characteristics.Our approach focuses on developing optimal strategies for production,maintenance,and quality control to minimize cost per unit of time.Additionally,we employ a stochastic model to optimize the production time allocated to the inventory buffer,resulting in significant cost reductions.The effectiveness of our proposed joint optimization method is demonstrated through comprehensive numerical experiments,sensitivity analysis,and a comparative study.The results show that our method can achieve cost reductions compared to several other related methods,highlighting its practical applicability for manufacturing companies aiming to reduce costs.
关 键 词:joint optimization degraded system CRPS control chart uncertain buffer stocking time
分 类 号:TU71[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.76.4