检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Jie Di Wenhao Xing Meng Wu Dan Zhang Jiashuo Zhao
机构地区:[1]Shijiazhuang Highway Construction and Development Center,Shijiazhuang 050019,Hebei Province,China [2]Shijiazhuang Tiedao University,Shijiazhuang 050043,Hebei Province,China [3]Information Department of Hebei Airlines Co.,Ltd.,Shijiazhuang 050802,Hebei Province,China [4]Sifang College,Shijiazhuang Tiedao University,Shijiazhuang 051133,Hebei Province,China [5]Huaxin College,Hebei University of Geosciences,Shijiazhuang 050702,Hebei Province,China [6]School of Civil Engineering and Transportation,Northeast Forestry University,Harbin 150006,Heilongjiang Province,China
出 处:《Journal of World Architecture》2024年第5期29-35,共7页世界建筑(百图)
摘 要:Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensions,posing significant challenges.To address inaccuracies in investment targets and operational complexities,this study focuses on a beam-bridge construction project in a district of Shijiazhuang city as a case study.Drawing upon historical analogs,the project employs a Work Breakdown Structure(WBS)to decompose the engineering works.Building on theories of Cost Significant(CS)and Whole Life Costing(WLC),the study constructs Cost Significant Items(CSIs)and develops a CNN-BiLSTM-Attention neural network for nonlinear prediction.By identifying significant cost drivers in engineering projects,this paper presents a streamlined cost estimation method that significantly reduces computational burdens,simplifies data collection processes,and optimizes data analysis and forecasting,thereby enhancing prediction accuracy.Finally,validation with real-world cost fluctuation data demonstrates minor errors,meeting predictive requirements across project execution phases.
关 键 词:Project management Cost Significant Items(CSIs) Engineering costing Intelligent estimation
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.10.159