检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谯生有[1,2] 周建东 关乾旭[1,2] QIAO Shengyou;ZHOU Jiandong;GUAN qianxu(The Fifth Engineering Co.,Ltd.of China Railway First Engineering Group,Baoji,Shaanxi 721006,China;Baoji Precision Surveying and Mapping Engineering Engineering Co.,Ltd.of China Railway First Engineering Group,Baoji,Shaanxi 721006,China)
机构地区:[1]中铁一局集团第五工程有限公司,陕西宝鸡721006 [2]中铁一局集团宝鸡精密测绘工程有限公司,陕西宝鸡721006
出 处:《测绘技术装备》2024年第3期95-99,共5页Geomatics Technology and Equipment
摘 要:针对城际铁路大跨度连续梁在运营期病害整治过程中原有桥面监测点无法正常观测,以及常规水准测量无法实施的问题,本文提出了一种利用连续梁通风孔布设监测标志,采用高精度智能全站仪三角高程法采集监测数据进行运营城际铁路大跨度连续梁竖向挠度监测的方法。经某城际铁路大跨度连续梁运维加固整治期间竖向挠度监测试验验证,该方法监测点布设简便,监测效率高,能够在不中断列车运营的情况下,准确测量运维整治期间连续梁竖向挠度的变化情况,为连续梁运维加固提供了可靠的监测信息。In order to solve the problems that the original monitored bridge deck points cannot be observed normally and conventional leveling cannot be implemented during the disease control process of large-span continuous beams in intercity railways operation,this paper proposes a method of using continuous beam ventilation holes to set monitoring signs and high-precision intelligent total station trigonometric elevation method to collect monitoring data for the vertical deflection monitoring of largespan continuous beams in intercity railway bridges.This method is proved by the vertical deflection monitoring test during the operation and reinforcement of a large-span continuous beam in an intercity railway to have such advantages as simple point layout,high operation efficiency,and it can be used to accurately measure the changes in vertical deflection of continuous beams during operation and maintenance without interrupting train running.It provides reliable monitoring information for the operation and reinforcement of continuous beams.
分 类 号:P258[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.118