检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈娟 CHEN Juan(Zhengzhou Ecological Water Supply Security Center,Zhengzhou 450000,China)
机构地区:[1]郑州市生态供水保障中心,河南郑州450000
出 处:《河南水利与南水北调》2024年第9期12-13,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:根据设计洪水分析计算、河道洪水位计算、河道冲刷淤积计算结果,结合建设项目的工程设计及施工,对河道演变趋势、河道冲淤变化及河道行洪、河势变化等进行分析,全面分析某大桥改建工程在施工期、工程运行期对河道防洪的影响,以及消除影响采取的防治措施等。文章通过对某大桥改建工程防洪影响分析,工程建设符合《防洪标准》等规程、规范要求,满足有关河道管理要求,对河道治理规划的实施影响很小。The analysis of the flood control impact of a bridge reconstruction project is mainly based on the design flood computations,the river flood level calculation,the channel erosion calculation,as well as the engineering design and construction of the project,the channel evolution trend,the channel erosion change,the flood carrying capacity,and the change of river regime,etc,The impact of the bridge reconstruction project on river flood control during the construction and operation of the project,and the control measures are analyzed.Through the analysis of the flood control impact of the bridge reconstruction project,the construction of the project meets the requirements of Flood Control Standards and the requirements of relevant river management,and has minor impact on the implementation of the river management planning.
分 类 号:TV87[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49