检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李磊 LI Lei(Zhecheng County Water Resources Bureau,Zhecheng 624700,China)
机构地区:[1]柘城县水利局,河南柘城624700
出 处:《河南水利与南水北调》2024年第9期58-59,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:河道由于长期运行使用,受冲刷容易产生淤积,使水位抬高,有可能加剧洪水灾害,威胁到河道的安全。因此,需要根据河道实际情况开展河道治理工程,以减轻河道汛期产生的渗漏滑坡险情,维护河道的安全。基于此,文章以柘城县惠济河盆尧村段工程现状和存在的问题,对河道治理工程中堤防、防汛道路等工程进行设计。工程的实施,不但能提高惠济河盆尧村段河道行洪能力,还能改善该流域水生态环境,提升人民群众居住环境。After a long time operation,the river is prone to siltation due to erosion,causing water levels to rise,aggravating flood disasters,and posing a threat to the safety of the river.Therefore,it is necessary to carry out river regulation based on the actual situation of the river,to reduce the risk of leakage and landslide hazard during the flood season and maintain the safety of the river.In the paper the design of dikes and flood control road of Huiji River Penyao Village section regulation project and is discussed.The implementation of Huiji River Regulation Project could not only improve the flood carrying capacity of Huiji River Penyao Village section,but also improve the water ecological environment,and enhance the people's living environment.
分 类 号:TV85[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7