检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡小东 田维 CAI Xiaodong;TIAN Wei(Downhole Testing Company,Sinopec Oilfield Services Jianghan Corporation,Wuhan,Hubei 430040,China)
机构地区:[1]中石化江汉石油工程有限公司井下测试公司,湖北武汉430040
出 处:《江汉石油职工大学学报》2024年第5期47-49,共3页Journal of Jianghan Petroleum University of Staff and Workers
摘 要:油气井下完井管柱前,需要拆除钻井四通或者修井四通,更换试压合格的采油(气)大四通。在拆装大四通前需要对井筒进行临时封堵作业,确保作业井控安全,但额外增加施工成本和施工周期,占用油气井投产的时间。结合临时封堵和完井工具及施工工艺,采用完井-临时封堵管柱一体化工艺,在现场应用成功。Before running the completion string into oil and gas wells,the drilling or workover spools must be removed and replaced with qualified tubing spools.Temporary plugging operations are required to ensure well control safety before removing and installing the spools,which increases job costs,time,and delays well production.By integrating temporary plugging and completion tools with treatment technology,this integrated completion string and temporary plugging technology was successfully applied on-site.
分 类 号:TE257[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.226.170