作 者:侯建军 刘瑞 郭明杰[3] 徐曙光 Hou Jianjun;Liu Rui;Guo Mingjie;Xu Shuguang(Henan Xinzheng Coal and Electricity Co.,Ltd.,Xinzheng 451100,China;Engineering Technology Research Institute,Zhengzhou Coal Industry(Group)Co.,Ltd.,Zhengzhou 450007,China;School of Energy Science and Engineering,Henan Polytechnic University,Jiaozuo 454000,China)
机构地区:[1]河南省新郑煤电有限责任公司,河南新郑451100 [2]郑州煤炭工业(集团)有限公司工程技术研究院,河南郑州450007 [3]河南理工大学能源科学与工程学院,河南焦作454000
出 处:《能源与环保》2024年第10期254-259,265,共7页CHINA ENERGY AND ENVIRONMENTAL PROTECTION
基 金:国家自然科学基金重点项目(U21A20108)。
摘 要:新郑煤电公司12203工作面地表存在一垃圾填埋场污水池,为最大程度地回收煤炭资源,同时有效保护污水池,对工作面开采对污水池的影响程度进行了研究,并提出了相应的方案措施。采用垂直剖面法确定了污水池的保护煤柱范围,并结合采动地表移动变形角值影响范围计算,分析工作面开采对污水池的影响程度。采用概率积分法对工作面整体不同厚度开采、限定采厚不同宽度开采和限定宽度不同厚度开采3种方案的地表移动变形进行了计算分析,提出了工作面采取局部区域限厚2.8 m开采的措施,限厚开采区域:倾向为自运输巷向上山方向30 m,走向为距开切眼70~170 m区域。并通过建立污水池移动变形观测站,监视地表移动变形情况,分析工作面开采对污水池的影响程度,并采取相应技术措施提供技术参考。There is a landfill sewage pool on the surface of the No.12203 working face of Xinzheng Coal and Electricity Company.In order to maximize the recovery of coal resources and effectively protect sewage pool,the impact of mining on sewage pool was studied and corresponding solutions and measures were proposed.The vertical section method was used to determine the range of protective coal pillars for the sewage pool,and the impact range of the mining surface movement deformation angle was calculated to analyze the degree of influence of the working face mining on the sewage pool.The probability integral method was used to calculate and analyze the surface movement and deformation of three mining schemes:overall mining with different thicknesses,limited mining with different widths,and limited mining with different thicknesses.The measure of local area limited thickness of 2.8 m was proposed for the working face.The limited thickness mining area:inclined from the lower roadway to the uphill direction of 30 m,and inclined towards an area 70 to 170 m away from the open-off cut.And by establishing an observation station for the movement and deformation of the sewage pool,monitoring the surface movement and deformation,analyzing the impact of mining on the sewage pool,and taking corresponding technical measures to provide technical reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.163.22