关于电气化铁路枢纽地区接触网电分段燃弧的研究  

Research on the Arc at the Electrical Segmentation of Overhead Contact System in Electrified Railway Hub Areas

在线阅读下载全文

作  者:孟祥光 Meng Xiangguang(Hefei High Speed Railway Infrastructure Section,China Railway Shanghai Group Co.,Ltd.,Hefei 230011,China)

机构地区:[1]中国铁路上海局集团有限公司合肥高铁基础设施段,合肥230011

出  处:《青海科技》2024年第4期173-176,183,共5页Qinghai Science and Technology

摘  要:京九线阜阳枢纽接触网电分段主要采用分段绝缘器和锚段关节两种形式。在长时间运行过程中发现,阜阳枢纽电力机车受电弓通过电分段时燃弧剧烈,甚至造成了电流增量保护动作及设备受损,对运输秩序造成巨大影响。文章对阜阳枢纽电力机车受电弓通过电分段的过程进行深入分析,找出燃弧与牵引负荷电流之间的关系,确定不同开闭所间电分段为剧烈燃弧多发处所,并就其设计方案进行探究,提出减小燃弧影响的优化设计方案。The electrical segmentation of the overhead contact system at Fuyang Hub on the Beijing Kowloon Line mainly adopts two forms:segmented insulators and anchor joints.During long-term operation,it was found that the pantograph of the Fuyang hub electric locomotive ignited violently when passing through the electric section,even causing current increment protection action and equipment damage,which had a huge impact on the transportation order.In this paper,a deep analysis was conducted on the process of the pantograph passing through the electric section to identify the relationship between arcing and traction load current,and to determine that the electric section between different switching stations is a location with frequent occurrence of severe arcing.The design scheme was explored,and an optimized design scheme was proposed to reduce the impact of arcing.

关 键 词:阜阳枢纽 接触网电分段 负荷电流 分段绝缘器 锚段关节 

分 类 号:U225[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象