检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢飞 刘卫斌 茹延吾 Xie Fei;Liu Weibin;Ru Yanwu(Shaanxi Railway Engineering Survey Co.,Ltd.,Xi’an Shaanxi 710000,China)
机构地区:[1]陕西铁道工程勘察有限公司,陕西西安710000
出 处:《山西建筑》2024年第23期105-107,187,共4页Shanxi Architecture
摘 要:黄土沟壑区超高填方的施工质量不易控制,往往工后沉降过大。采用小间距加筋土挡土墙对陕北某工程超高填方边坡进行了设计加固,经过现场精细施工把控,加固效果良好,工后沉降稳定。总结其设计施工经验,提出适合黄土沟壑区复杂地形条件下小间距加筋土挡土墙施工控制重难点,希望为黄土丘陵区超高填方建设提供参考经验。The construction quality of ultra-high fill in loess gully areas is not easy to control,and often the post-construction settlement is too large.Small-spacing reinforced earth retaining walls were used to design and reinforce the ultra-high fill slope of a project in northern Shaanxi.Through on-site fine construction control,the reinforcement effect is good and the post-construction settlement is stable.Summarizing its design and construction experience,the key and difficult points of construction control of small-spacing reinforced earth retaining walls under the complex terrain conditions in loess gully areas are proposed,hoping to provide reference experience for ultra-high fill construction in loess hilly areas.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33