某厂钢烟囱施工技术措施探讨  

Exploration of Construction Technical Measures for Steel Chimney in a Certain Factory

在线阅读下载全文

作  者:曹万友[1] 赵亚斌 Wanyou Cao;Yabin Zhao(Jiugang Group Hongxing Co.,Ltd.Ironmaking Plant,Jiayuguan,Gansu 735100)

机构地区:[1]酒钢集团宏兴股份公司炼铁厂,甘肃嘉峪关735100

出  处:《新疆钢铁》2024年第3期138-140,共3页Xinjiang Iron and Steel

摘  要:钢烟囱由于自身的建设周期和成本优势以及安装施工的特点,在钢铁冶炼行业使用占比的不断提高,现就以某厂半干法循环流化床脱硫(CFB)+中高温SCR脱硝工艺钢烟囱安装施工为背景,总结了钢烟囱安装施工技术措施,以期为类似工程提供有益的参考。Due to its construction period,cost advantages,and installation and construction characteristics,the proportion of steel chimneys used in the steel smelting industry continues to increase.Taking the installation and construction of steel chimneys using semi dry circulating fluidized bed desulfurization(CFB)+medium high temperature SCR denitrification process in a certain factory as the background,this article summarizes the technical measures for steel chimney installation and construction,in order to provide useful reference for similar projects.

关 键 词:钢烟囱 施工技术措施 探伤试验 

分 类 号:TU761.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象