检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王志强[1,2] 鞠路超 李廷照 王兆瑞 潘伟 WANG Zhiqiang;JU Luchao;LI Tingzhao;WANG Zhaorui;PAN Wei(School of Energy and Mining Engineering,China University of Mining and Technology-Beijing,Beijing 100083,China;China-Russia Dynamics Research Center,China University of Mining and Technology-Beijing,Beijing 100083,China)
机构地区:[1]中国矿业大学(北京)能源与矿业学院,北京100083 [2]中国矿业大学(北京)中俄动力学研究中心,北京100083
出 处:《矿业科学学报》2024年第5期767-776,共10页Journal of Mining Science and Technology
基 金:国家自然科学基金(51774289,52074291)。
摘 要:针对新巨龙煤矿1301综放工作面区段间留设煤柱尺寸较大造成的资源浪费和回采巷道支护困难等问题,本文提出采用错层位外错式巷道布置方案,建立错层位非常规煤柱力学模型,利用极限平衡理论分析了非常规煤柱应力环境和极限平衡区特征;考虑不同错距下沿底巷道所处应力环境及区段煤柱弹性应变能密度分布特征,确定下区段沿底巷道合理错距为3.0 m;同时引入区段间相邻巷道联合支护方案,对实际地质条件下接续工作面回采阶段区段间相邻巷道联合支护方案和传统支护方案进行模拟验证。结果表明:区段间相邻巷道联合支护方案优于传统支护方案,峰值应力由80 MPa降至64 MPa,降低率为20%,表明其对巷道围岩控制更为有效;区段煤柱单位留设面积为111.5 m^(2),相较于传统支护方案区段煤柱的170 m^(2),降低率为34.4%。研究结果对减少区段煤柱留设尺寸和提高煤炭回采率起到积极的推动作用。This study proposes a layout scheme for external staggered roadway and builds a mechanical model for unconventional coal pillars with staggered positions as a solution to the waste of resources caused by the large coal pillar size between the sections of 1301 fully mechanized top coal caving face and the difficulty in supporting the roadway in Xinjulong Coal Mine.We analyzed the stress environment and characteristics of the extreme equilibrium zone of unconventional coal pillars using the limit equilibrium theory.For the bottom roadway,the reasonable horizontal staggered distance in the lower section is set at 3.0 meters after considering its stress environment at different horizontal offset conditions and the distribution of elastic strain energy density of the section coal pillars.Meanwhile,we proposed a joint support scheme for adjacent roadways between sections.We simulated and verified the original support scheme and the joint support scheme in actual geological conditions during the mining stage of the continuous working face.Results show that the joint support scheme for adjacent roadways between sections outperforms the original support scheme.The peak stress of the joint support scheme reduced from 80 MPa to 64 MPa,with a reduction rate of 20%,indicating that the it is more effective in controlling the surrounding rock of the roadway.Moreover,the unit reserved area of coal pillars in the section was 111.5 m^(2),which is a 34.4%reduction from 170 m^(2) in the original support scheme.This study offers implications for reducing the reserved size of coal pillars in fewer sections and improving the coal recovery rate.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117