检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐文军 郝金海 朱凌峰 陈晴 王国华 XU Wen-jun;HAO Jin-hai;ZHU Ling-feng;CHEN Qing;WANG Guo-hua(Ningbo Expressway Management Center of Zhejiang Communications Group,Ningbo 315000,China)
机构地区:[1]浙江交通集团高速公路宁波管理中心,浙江宁波315000
出 处:《工程建设与设计》2024年第20期76-78,共3页Construction & Design for Engineering
摘 要:总结了目前我国高速公路隧道养护施工采用的超限车辆管控措施,介绍了基于边缘计算机的超限车识别系统,以G15沈海高速公路宁波段麻岙岭隧道病害处治工程为依托,介绍了其施工封道区超限车管控方案。从现场管控实效来看,在该项目施工的28 d内共有效阻拦超限车辆223辆,无超限车误闯的事故发生,确保了养护工程的顺利实施。This paper summarizes the current control measures of over-limit vehicles adopted in the maintenance and construction of highway tunnels in China,introduces the identification system of over-limit vehicles based on edge computer,and the control scheme of over-limit vehicles in the construction closure area based on the disease treatment project of Ma'aoling tunnel of G15 Shenhai Expressway in Ningbo.From the perspective of the effectiveness of site control,a total of 223 over-limit vehicles were effectively blocked within 28 days of the project construction,and no over-limit car accident occurred,ensuring the smooth implementation of the maintenance project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.163.22