动静荷载作用下煤矿TBM滚刀贯入度预测理论模型  

Theoretical Model for Predicting Penetration of Coal Mine TBM Disc Cutter under Dynamic-Static Load

在线阅读下载全文

作  者:王成博[1] 沈仁为[1] 李宏亮 张鹏涛[1] 程晋轶 李天国 唐彬[2,3] WANG Chengbo;SHEN Renwei;LI Hongliang;ZHANG Pengtao;CHENG Jinyi;LI Tianguo;TANG Bin(Huainan Mining Industry(Group)Co.,Ltd.,Huainan 232001,China;School of Civil Engineering and Architecture,Anhui University of Science and Technology,Huainan 232001,China;State Key Laboratory of Mining Response and Disaster Prevention and Control in Deep Coal Mines,Anhui University of Science and Technology,Huainan 232001,China)

机构地区:[1]淮南矿业(集团)有限责任公司,安徽淮南232001 [2]安徽理工大学土木建筑学院,安徽淮南232001 [3]安徽理工大学深部煤矿采动响应与灾害防控国家重点实验室,安徽淮南232001

出  处:《煤炭技术》2024年第10期231-234,共4页Coal Technology

基  金:安徽省自然科学基金面上项目(2208085ME118);深部煤矿采动响应与灾害防控国家重点实验室自主课题(SKLMRDPC20ZZ04);安徽高校自然科学研究重大项目(KJ2021ZD0049)。

摘  要:全断面掘进机(TBM)掘进过程中,除步进油缸顶推刀盘,带动滚刀切入岩石外,滚刀还受到不同程度的冲击。为研究TBM滚刀在“顶推-冲击”动静荷载耦合作用下的破岩特性,建立了动静荷载作用下滚刀破岩理论分析模型。分别对静载和动载条件下TBM滚刀贯入度进行开展分析研究,获得了动静荷载作用下TBM滚刀贯入度计算公式。基于煤矿TBM掘进硬岩巷道工程问题,计算TBM掘进煤矿巷道滚刀贯入度,并与滚刀贯入度现场监测数据对比,研究结果表明:TBM施工现场滚刀贯入度最大14.7 mm,最小5.2 mm,平均值为9.76 mm,滚刀贯入度理论计算值为9.27 mm,验证了理论模型的准确性。During the excavation process of the tunnel boring machine(TBM),in addition to the thrust hydraulic cylinder pushing the cutterhead and driving the disc cutters to penetrate the rock,the disc cutters are also subjected to varying degrees of impact.In order to study the rock-breaking characteristics of TBM disc cutters under the coupled effect of"pushing-impact"dynamic-static loads,a theoretical analysis model for the rock-breaking of the disc cutters under dynamic-static load was established.The penetration rate of the TBM disc cutters was analyzed and researched under both static and dynamic load conditions,and the calculation formula for the penetration rate of the TBM disc cutters under dynamic-static load was obtained.Based on the TBM excavation of hard rock tunnels in coal mines,the penetration rate of the disc cutters in coal mine tunnels was calculated,and the results were compared with the field monitoring data of the penetration rate.The research results showed that the maximum penetration rate of the disc cutters on the TBM construction site was 14.7 mm,the minimum was 5.2 mm,and the average was 9.76 mm.The theoretical calculation value of the penetration rate was 9.27 mm,which verified the accuracy of the theoretical model.

关 键 词:煤矿 滚刀 动静荷载 贯入度 理论模型 

分 类 号:TD265[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象