检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:耿轶君 肖晴侠 孙兴邦 孟松涧 陈安东 GENG Yi-jun;XIAO Qing-xia;SUN Xing-bang;MENG Song-jian;CHEN An-dong(Yellow River Survey,Planning and Design Institute Co.,Ltd.,Zhengzhou 450003,China;Geotechnical and Structural Engineering Research Center,Shandong University,Ji'nan 250061,China)
机构地区:[1]黄河勘测规划设计研究院有限公司,郑州450003 [2]山东大学岩土与结构工程研究中心,济南250061
出 处:《科学技术与工程》2024年第28期12316-12324,共9页Science Technology and Engineering
基 金:国家自然科学基金面上项目(52079076);山东省自然科学基金优秀青年基金(ZR2022YQ46)。
摘 要:双护盾隧道掘进机(tunnel boring machine,TBM)对不良地质的适应性较差,如遇突泥涌水、围岩破碎垮塌等不良地质灾害时,极易发生TBM卡机,造成工期延误和经济损失。以兰州水源地工程为研究背景,结合双护盾TBM施工特点,分析电磁干扰、护盾较长、管片支护等因素影响,利用TBM刀盘孔和管片注浆孔,结合辅助装置,改进地震波法和电阻率法观测系统,提出了适用于双护盾TBM综合预报体系。研究结果表明:综合超前地质体系较好地适应了双护盾TBM施工特点,且能有效识别前方破碎带和地下水的发育情况,结合现场应用实例,验证了该方法的可行性和有效性,可供同类工程借鉴与参考。The adaptability of double-shield tunnel boring machine(TBM)to bad geology is poor,such as in the case of sudden mud water,surrounding rock crushing and collapse and other bad geological disasters,it is easy to occur TBM stuck,resulting in construction delay and economic losses.Based on the research background of Lanzhou water source project,combined with the construction characteristics of double shield TBM,the influences of electromagnetic interference,longer shield and segment support were analyzed.The observation system of seismic wave method and resistivity method were improved by using TBM cutterhead holes and segment grouting holes,combined with auxiliary devices,and a comprehensive prediction system suitable for double shield TBM was proposed.The research results show that the comprehensive advanced geological system can better adapt to the construction characteristics of double-shield TBM,and can effectively identify the development of the fractured zone and groundwater in front of it.Combined with field application examples,the feasibility and effectiveness of the method were verified,which can be used as reference for similar projects.
关 键 词:双护盾隧道掘进机(TBM) TBM卡机 不良地质灾害 观测系统 综合预报体系 现场应用
分 类 号:TV554[水利工程—水利水电工程] P642[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74