检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹志鹏 CAO Zhipeng(Huozhou Coal Power Group Safety Supervision Center,Huozhou 031400,China)
机构地区:[1]霍州煤电集团安全监管中心,山西霍州031400
出 处:《煤矿现代化》2024年第6期59-62,68,共5页Coal Mine Modernization
摘 要:通过对5-1042巷围岩力学性质进行了测试,基于巷道破坏特征,确定了围岩受力不稳定区域,经计算初步得到锚杆锚索支护参数。基于采空区平衡模拟和巷道开挖模拟,确定了平衡以及巷道开挖后最大垂直应力和水平应力,随后确定了锚网索支护方式,采用十字布点法对小煤柱沿空掘巷围岩稳定性进行观测,巷道围岩变形量小,无离层现象发生,证明了支护方案的可行性。The mechanical properties of surrounding rock in Lane 5-1042 are tested.Based on the failure characteristics of the tunnel,the unstable area of the surrounding rock under stress was determined,and the preliminary parameters of anchor rod and cable support were obtained through calculation.Based on the simulation of goaf balance and tunnel excavation,the maximum vertical and horizontal stresses after the balance and tunnel excavation were determined.Subsequently,the anchor mesh cable support method was determined,and the cross point method was used to observe the stability of the surrounding rock of the small coal pillar driving along the goaf.The deformation of the surrounding rock of the tunnel was small,and there was no occurrence of separation,proving the feasibility of the support plan.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.189.3.134