检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贾冬冬 JIA Dongdong(Shanxi Coking Coal Huozhou Coal and Electricity Dianping Coal Mine,Fangshan 033100,China)
机构地区:[1]山西焦煤霍州煤电店坪煤矿,山西方山033100
出 处:《煤矿现代化》2024年第6期83-87,共5页Coal Mine Modernization
摘 要:店坪煤矿9-208工作面地表建有郝放沟骨干坝,为了实现水坝下安全采煤,根据店坪煤矿井上下实际地质采矿条件及相关资料,应用覆岩裂高理论及概率积分法分别对水坝下穿采工作面的可行性进行安全论证,继而应用数值模拟对理论分析结果进行验证,最终综合分析、评价和论证,结果表明,9-208工作面采掘不会对水坝坝体造成破坏影响,采取的技术措施为骨干坝下安全采煤提供了可靠的技术支撑。Haofanggou backbone dam is built on the surface of working face 9-208 of Dianping Coal Mine.In order to realize safe mining under the dam,according to the actual geological mining conditions and relevant data above and below the mine of Dianping Coal mine,the overburden fracture height theory and probability integral method are applied to conduct safety demonstration on the feasibility of mining working face under the dam,and then the theoretical analysis results are verified by numerical simulation.The final comprehensive analysis,evaluation and demonstration show that the mining of 9-208 working face will not cause damage to the dam body,and the technical measures adopted provide reliable technical support for safe coal mining under the backbone dam.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49